Wabageshik Dam Rehabilitation
Project Overview
Bronte Construction was hired by Vale Construction to facilitate the structural reinforcement of a hydro electric asset located in located in Sudbury Ontario. Bronte Construction Deep Foundation team used in HD110 Excavator Mount to drill all the required holes to facilitate the grouting activities. Additionally Bronte Construction retooled the rig to install the required tiebacks to retain the training wall.
Scope of Work
- Environmental Control Measures
- Drilling
- High Pressure Grouting
- Supply and Install Rock Anchors
Recommended Posts