Tag: High Pressure Grout

Foundation Construction

Wabageshik Dam Rehabilitation

Drilling several three-inch diameter curtain grout holes into the bed rock in primary and secondary.  The holes are cleaned with water, then pressure grouted the holes in ten-foot increments.

Read More »