Port Dover Jetty Rehabilitation

Project Overview

Bronte construction was hired by PWGSC to reconstruction the Jetty located in Meaford Harbour.  The majority of the project was completed from barges, anchored in Lake with a Excavator Mounted HTFB 60 Lodril and Spider Crane.  Working withing the watercourse always has unexpected challenges and this project was no different.  Sub Zero weather combined with uncharacteristically high winds put the Bronte team to the test.

Scope of Work

  • In-Water Works
  • Working from barges 
  • Environmental Control Measures
  • Supply and installation of new Bollards
  • Supply and Installation of new fenders
  • Supply and installation of new Drainage piping
  • Electrical works 
  • Concrete Works
  • Sheet piling
  • Removal and Disposal existing sheet pile fenders
  • Site Restoration