Pointe Peele Boardwalk

Project Overview

Bronte Construction was hired by Parks Canada for the supply and installation of a new Boardwalk located in Point Pelee National Park.  Work of this Contract comprises general construction of Marsh Area Renewal – Phase 1, located at Point Pelee National Park, Leamington, Ontario.  Design and install boardwalk structure including deck at Marsh Tower area. Including Design, supply and install of complete steel farming, all wood components, cathodic corrosion protection system and connection to existing floating boardwalk. Also including removal and reinstatement of wood pergola and other site fixtures.

Bronte Construction Deep Foundations team deployed an unmanned Husqvarna DXR140 robot which allowed our teams to effectively and efficiently achieve specific design requirements with a minimal amount of impact on the natural landscape of the National Park.  

Scope of Work

  • In-Water Works
  • Environmental Control Measures
  • Supply and install of Helical Screw Piles
  • Pedestrian Traffic Control
  • Site Restoration

Project Photos

Recent Posts