Bronte Construction successfully delivered slope stabilization and roadway protection works at two critical locations along the Don Valley Parkway corridor: Dallimore Circle and Chester Hill Road. The project addressed long term slope performance, erosion control, and infrastructure stability in a highly constrained urban environment with active traffic management requirements.

Scope of Work

Site 1 – Chester Hill Road

  • Clearing and grubbing
  • Large tree removal
  • Excavation works
  • Removal of SBGR
  • Granular backfill placement
  • Installation of soil anchors
  • Installation of helical piles
  • Concrete placement in footings and refacing
  • Mass concrete placement
  • Reinforcement placement
  • Subdrainage installation

Site 2 – Dallimore Circle

  • Clearing and grubbing
  • Large tree removal
  • Excavation works
  • Removal of SBGR
  • Installation of soil nails
  • Placement of biodegradable erosion control blanket
  • Installation of galvanized wire mesh
  • Construction of counterfort trench including backfill and compaction
  • Installation of geosynthetic liner
  • Subdrainage installation
  • Riprap and riverstone placement