Don Valley Parkway – Dallimore Circle & Chester Hill Rd
Project Overview
Bronte Construction successfully delivered slope stabilization and roadway protection works at two critical locations along the Don Valley Parkway corridor: Dallimore Circle and Chester Hill Road. The project addressed long term slope performance, erosion control, and infrastructure stability in a highly constrained urban environment with active traffic management requirements.
Scope of Work
Site 1 – Chester Hill Road
- Clearing and grubbing
- Large tree removal
- Excavation works
- Removal of SBGR
- Granular backfill placement
- Installation of soil anchors
- Installation of helical piles
- Concrete placement in footings and refacing
- Mass concrete placement
- Reinforcement placement
- Subdrainage installation
Site 2 – Dallimore Circle
- Clearing and grubbing
- Large tree removal
- Excavation works
- Removal of SBGR
- Installation of soil nails
- Placement of biodegradable erosion control blanket
- Installation of galvanized wire mesh
- Construction of counterfort trench including backfill and compaction
- Installation of geosynthetic liner
- Subdrainage installation
- Riprap and riverstone placement
Location
Toronto, ON
Owner
City of Toronto
Consultant
Doug Dixon Associates
Service Group
Sub-Services