Wabageshik Dam Rehabilitation

 In Foundation Construction, Projects

Location: Sudbury, Ontario

Owner: Vale Construction

Consultant: Hatch Engineering 

Drilling several three-inch diameter curtain grout holes into the bed rock in primary and secondary.  The holes are cleaned with water, then pressure grouted the holes in ten-foot increments.

Scope of Work

  • Environmental Control Measures 
  • Drilling
  • High Pressure Grouting
  • Supply and Install Rock Anchors
Recommended Posts

Leave a Comment