Birchmount Culvert Replacement

Project Overview

Bronte Construction was hired to complete the culvert replacement under Birchmount Road for the Massey Creek and under the Don Valley Parkway for the East Don River. The project was split up into 2 phases.

In Phase 1, our team successfully removed two existing CSP steel culverts and replaced them with new precast concrete box culverts. This complex work involved lag shoring, a cofferdam system, and a hydraulic submersible pump to keep Massey Creek flowing smoothly throughout construction.

In Phase 2, Bronte Construction focused on completing the remaining culvert replacements and finalizing this critical infrastructure upgrade.

Scope of Work

  • Demolition of exiting CSP culvert
  • Curb and asphalt removals
  • Roadway protection
  • Shoring
  • Excavation
  • Installed a new cast-in-place twin concrete culvert with reinforcement
  • Waterproofing
  • Concrete patch work
  • Crack injection
  • Asphalt paving
  • Concrete curb and gutter
  • Chain link fence
  • Tree plantings
  • Bell work
  • Hydro work
  • Gas and watermain supporting
  • Electrical work and traffic control

Location

Owner

Consultant

Sub-Services